Smartest%20Energy%2024_edited.jpg

smartestenergy

Canary Wharf, London

Size                  14,000 sq ft

Programme     18 weeks plus furniture 

         

"It has been my absolute pleasure to work with 3-Space (UK) Ltd on this project. The reason I chose to work with 3-Space was the fact that I felt no job would be too big or small. If you asked them to do something, they’d already thought of it and were on it. 3-Space were on my level, very reassuring and gave me total confidence in their ability to deliver what to me was a huge job. They made it seamless and manageable. They are a delight to work with and I can only commend them in the highest possible terms.  Would I use them again? In a heartbeat.”

 

press to zoom

press to zoom

press to zoom
1/3
Smartest Energy 1.jpg
Smartest Energy 11.jpg

press to zoom

press to zoom

press to zoom
1/4

SCOPE OF WORKS

CAT A & CAT B Fit Out with Procurement of Furniture - Ceiling Modifications - Corporate Signage - Decorations - Electrical Installations - Feature Brick and Moss Wall Coverings - New Kitchen and Breakout Area - Feature Floor Coverings - Feature Meeting Areas - New Partitions - Doors -Trading Area - Waiting / Viewing Area - Large Collaboration Area - Boardrooms - Feature Cork & Moss Walls with Signage - Meeting Pods - Wall Graphics - Breakout Area - Town Hall Area with Stepped Seating

In the heart of Canary Wharf, 3-Space undertook their biggest project to date with the transformation of an empty shell on behalf of SmartestEnergy, a renewable energy company. Leaving the mechanical work on display created an industrial look which was softened through the clever use of colours, feature moss and cork walls and furnishings. Zoned areas were built for the different functions including a dedicated trading room which is overlooked by a viewing area complete with a feature cork wall and café style seating, a town hall area for informal company gatherings, meetings pods and a well appointed break out area.